Description:
Currently, under the current urban development plan, the plot is classified as unconsolidated urban land, making construction unfeasible. It is awaiting a PERI (Special Interior Reform Plan), meaning it would need an urbanization project, and the initiative would be cooperative, which means it doesn't solely depend on the owner. It is worth mentioning that in the 2010 urban plan, which was annulled, this plot was designated for public fac...
• Chambres: 0 |
• Salles de bain: 0 |
• Terrain: 3,129 m2 |
• Orientation: Sud |
• •view_type: Mer
Général: Proche des écoles, Près de la mer, Proche des commerces, Électricité